Practice: continuous loads
Each problem uses new numbers, so you practice the method rather than memorizing an answer.
Pick the answer: sizes and ratings come from your code book.
Worked solution
Formula
| Symbol | Meaning | Unit |
|---|---|---|
| C | Continuous load (3 hours or more) | A |
| N | Noncontinuous load | A |
| P | Overcurrent device rating, a standard size from 240.6(A) | A |
Worked example
A feeder supplies 130 A of continuous load and 110 A of noncontinuous load. The overcurrent device is a standard breaker, not listed for 100% operation. Under 215.3, what is the minimum standard rating for the feeder breaker?
- The continuous load counts at 125%: 130 × 1.25 = 162.50 A.
- Add the noncontinuous load at 100%: 162.50 + 110 = 272.50 A.
- The breaker must be rated at least 272.50 A. The next standard rating at or above it in 240.6(A) is 300 A.
Answer: 300 A
Continuous loads, explained
Breakers and terminals heat up when they carry current for hours. A standard breaker is tested to carry only 80% of its rating continuously, so the NEC makes you size for 125% of a continuous load. 125% and 80% are the same rule seen from opposite sides: 1 ÷ 1.25 = 0.80.
Store and office lighting, parking lot lights, water heaters and EV chargers are typical continuous loads. On the exam, a load is continuous when the question says it runs 3 hours or more or calls it continuous. Do not assume it.
Apply the 125% only to the continuous part, then add the noncontinuous part at 100%. Use the result to pick both the overcurrent device (next standard size up) and the conductor (from the termination column of Table 310.16). The 100% exception for assemblies listed for continuous operation applies only when the question says so.
For conductors there is a second check. The conductor ampacity after correction and adjustment must carry the actual load, without the 125%. The two checks are separate: you do not stack the 125% on top of derating. In the 2026 NEC, load calculations in Article 120 no longer add the 125% themselves; the factor is used when you size the conductors and the devices.
How to solve it on the exam
- Split the load into continuous (3 hours or more) and noncontinuous amperes.
- Multiply the continuous part by 1.25 and add the noncontinuous part.
- For the breaker or fuse, pick the next standard rating at or above that number in 240.6(A).
- For the conductor, pick the size in the termination column (60 °C or 75 °C) of Table 310.16 that carries that number.
- If there is derating, also check that the derated ampacity carries the actual load (no 125%), and use the larger conductor of the two checks.
Common mistakes
- Applying 125% to the noncontinuous load too.
- Forgetting the 125% when the question says the load runs for 3 hours or more.
- Rounding the device down to the standard size below the calculated value.
- Multiplying the derated ampacity requirement by 125% as well (stacking both checks).
- Loading a 20 A breaker to 20 A of continuous load instead of 16 A.
Exam tips
- Underline the words continuous, 3 hours or more, and store or office lighting. They tell you the 125% applies.
- Remember the shortcut: a breaker may carry 80% of its rating continuously. 15 A → 12 A, 20 A → 16 A, 30 A → 24 A.
Continuous loads calculator
Questions people ask
What is a continuous load in the NEC?
A load where the maximum current is expected to continue for 3 hours or more. Commercial lighting, water heaters and EV chargers are common examples.
Why do you multiply continuous loads by 125%?
Because standard breakers and terminals are only rated to carry 80% of their rating for long periods. Sizing at 125% of the continuous load keeps the load at or below 80% of the device.
How much continuous load can a 20 A breaker carry?
16 A. Divide the rating by 1.25, or multiply it by 0.80.
Did the 2026 NEC remove the 125% rule?
No. The 2026 NEC says load calculations in Article 120 do not multiply continuous loads by 125%, but branch-circuit and feeder conductors and overcurrent devices are still sized at 125% of the continuous load plus the noncontinuous load.
Sources
About the tables: The exam is open book. These problems cite the 2026 NEC section and table so you practice finding them in your own book. We never print NEC text or tables.